The process today
How the business does it now
Taken from DID963, the written procedure, not from memory. Fourteen steps, four people, several hours a report, ninety a year. This is the thing being replaced, so it is worth being exact about it.
Who is involved
| Who | What they do |
|---|---|
| Support PAR supportpar@ |
Writes the report. Opens the Word template, looks up every field on the ACT websites, captures and formats every image, assembles the PDF, and sends it out. This is the role the new report replaces most of. |
| Planning Emily Keane |
Owns the planning figures. The site coverage table in the procedure carries her name and the date 7 April 2026 — the figures have been through a planner once already, in the procedure. |
| Support Sales | Confirms the customer may be booked before an appointment is made. |
| Canberra staff | Answer the questions the procedure cannot — it says to contact them when in doubt. |
| The customer | Supplies the Needs Analysis Survey, which decides the property type and forms the meeting agenda. |
The fourteen steps
As numbered in the procedure. The right column is what it costs in hand work.
What that adds up to
Where the time actually goes
Not in the thinking. The planning judgement is a small part of it — most of the work is looking up the same fields on the same five websites, capturing images to a fixed size with a blue border, and cutting and joining PDFs in a fixed order.
That is the part a machine should do, and it is the part that goes wrong quietly: a contour layer that did not load, an imagery layer that failed over to an older one, a figure typed from the wrong block.
And the part that cannot be automated as it stands
| What | Why |
|---|---|
| The percentage probability of a compliant build | The procedure never says how it is arrived at, so it is a judgement the writer makes. A machine cannot reproduce a judgement, and should not pretend to. |
| When the block was approved | A procedure that specifies image border colours never says where to get this date — and the whole front setback schedule depends on it. |
| Verge distance and front access | Two of the thirteen drawings, with no source named anywhere. |
Why this page exists
So the new report can be argued against what actually happens, not against an idea of it — and so that when a step is automated it is obvious which one, and what it used to cost.
Source: DID963 Create Desktop Planning Assessment Report, read 30 September 2026. The template it produces is DID964, revised 25 January 2024.